In November 2017, the City entered into a lease agreement with a developer to build two new hotels on vacant airport parcels. The first hotel, which is a Home2Suites property, will be built on the parcel located on Hesperian Boulevard.
Within the past year, the following items have taken place and have allowed the project to commence construction:
• Preparation and approval of plans and specifications.
• FAA determinations that the proposed structures were not a hazard to air navigation
• FAA verification that the leasehold had been released for non-aeronautical use
• Issuance of building permits and payment of fees
• Installation of perimeter fencing, and
• Commencement of grading at site
Due to the nature of this project, which utilizes prefabricated rooms built off-site, construction should be completed within just one year, with completion in the Fall of 2021.