Legislation Details

File #: CONS 24-377   
Section: Consent Status: Agenda Ready
Meeting Body: City Council
Agenda Date: 8/20/2024 Final action:
Subject: Adopt a Resolution Approving the New Update to the Guidelines for Installation of Speed Humps
Attachments: 1. Attachment I Staff Report, 2. Attachment II Resolution, 3. Attachment III Guidelines for Installation of Speed Humps

DATE:      August 20, 2024

 

TO:           Mayor and City Council

 

FROM:     Director of Public Works

 

SUBJECT                     

Title                      

 

Adopt a Resolution Approving the New Update to the Guidelines for Installation of Speed Humps                                                             

 

End
RECOMMENDATION

Recommendation

 

That the Council adopts a resolution (Attachment II) approving a new update to the Guidelines for Installation of Speed Humps (Attachment III).

End

 

SUMMARY

 

Staff recommend updating criteria relevant to Hayward’s traffic conditions and street characteristics. Recommended updates include:

 

Criteria

Existing

Proposed

2) 85th percentile speed

32 mph

30 mph

3) Street classification

Residential

Local and collector

7) Uninterrupted block length

750 feet

300 feet

9) Average daily traffic volume

Must range from 500 to 4,000 vehicles

Should range from 500 to 4,000 vehicles

11) Transit route

Prohibited

Possible, but requires coordination with AC Transit

14) 85th percentile guideline may be waived for schools

For streets fronting schools

For streets within school zones defined by California Vehicle Code

16) Placement distance to intersections

250 feet

150 feet. 250 feet from intersection with arterial

20) Distance to driveways

Must be no closer than 10 feet

Should be no closer than 10 feet

21) Number of speed humps

Spacing should allow at least two speed humps on each block

One speed hump is acceptable where other requirements preclude two

24) Placement with transit stops

N/A

No closer than 110 feet before and 30 feet after transit stop

 

 

 

ATTACHMENTS

Attachment I                     Staff Report

Attachment II                     Resolution

Attachment III                     Guidelines for Installation of Speed Humps