File #: CONS 16-310   
Section: Consent Status: Passed
Meeting Body: City Council
Agenda Date: 6/14/2016 Final action: 6/14/2016
Subject: Water Pollution Control Facility (WPCF) Headworks Rehabilitation Project: Approval of Addendum No. 1, Award of Construction Contract, and Appropriation of Funds.
Attachments: 1. Attachment I Resolution, 2. Attachment II Resolution Appropriation of Funds, 3. Attachment III Bid Summary

DATE:      June 14, 2016

 

TO:           Mayor and City Council

 

FROM:     Director of Utilities & Environmental Services

 

SUBJECT                     

Title                      

Water Pollution Control Facility (WPCF) Headworks Rehabilitation Project: Approval of Addendum No. 1, Award of Construction Contract, and Appropriation of Funds.                                                             

End


RECOMMENDATION

Recommendation

That Council adopts the attached resolutions:

1.                     Approving Addendum No. 1, which provides minor revisions to the Plans and Specifications

2.                     Awarding the contract to TNT Industrial Contractors, Inc., in the amount of $1,722,248, and

3.                     Appropriating additional funds in the amount of $1,422,248 in FY 2016.

 

Body

BACKGROUND

 

The City’s WPCF provides treatment for wastewater collected from the City’s residential and business communities.  The facility treats an annual average flow of twelve million gallons per day (MGD) and meets current requirements to discharge treated effluent to the deep waters of the San Francisco Bay.  All of the flow coming to the WPCF passes through the headworks and is conveyed through influent channels with grinders designed to break down large debris prior to pumping to downstream treatment processes.  The Headworks Building was originally constructed in 1996 and is an essential facility at the WPCF.

 

A recent structural inspection revealed substantial deterioration of the concrete on the interior deck of the influent channels inside the Headworks Building caused by exposure to hydrogen sulfide, a corrosive gas and a common byproduct of sewer collection and conveyance.  The protective coatings originally installed in the headworks had deteriorated over the years and in some areas had completely failed leading to substantial corrosion including loss of the cement covering the reinforcing steel in some areas.  The Headworks Rehabilitation Project is intended to repair concrete areas that have deteriorated, as well as provide for new concrete coatings and improved ventilation inside the building.  In February 2016, staff selected and entered into a professional services agreement with Carollo Engineers for design and engineering services during construction for the Headworks Rehabilitation Project. 

 

 

 

 

 

DISCUSSION

 

On May 3, 2016, Council approved the plans and specifications for the project and called for bids to be received on June 7, 2016.  The City received four (4) bids for the project, ranging from $1,722,248 to $2,040,000.  TNT Industrial Contractors, Inc. submitted the low bid in the amount of $1,722,248, which is approximately 14% below the Engineer’s estimate of $2,015,000.

 

ECONOMIC IMPACT

 

Hayward has both a robust industrial area and a firm commitment to protection of the environment and to sustainability. Rehabilitating the Headworks is essential to maintaining the ability to treat the City’s waste water appropriately.  Without a functioning Headworks facility, we not only risk potential sewer overflows in the City, but jeopardize the ability to convey the wastewater to treatment processes downstream.  Retrofitting and maintaining existing facilities is essential for environmental protection of the San Francisco Bay and continued economic development in the City.

 

FISCAL IMPACT

 

The estimated project costs are as follows:

 

Design and Engineering Services During

Construction (Consultant)                                                                                                                              $   275,000

Design Administration - City Staff                                                                                                                 25,000

Construction Contract                                                                                                                               $1,722,248

(Including Administrative Change Orders)                                                               

Inspection and Testing (Estimated)                                                                                                                  50,000

Total                                                                                                                                                                                             $2,072,248

 

The FY 2016 and FY 2017 Capital Improvement Program (CIP) includes funding for the projects described in the Sewer Replacement Fund (Fund 611).  The projects are described in the approved CIP as follows:

 

Fund                     Project No.                     Description                                                                                                                               Budget

611                     TBD                                          FY17 WPCF Headworks Renewal and

Replacement Project                                                                                                          $ 1,100,000

                     611                     07660                                          FY 16 WPCF Headworks Wetwell Concrete

Evaluation, Repair & Interior Coating                                                  500,000

                     611                     07663                                          FY 16 WPCF Headworks Ventilation Modifications                             150,000

                                                                                    Total                                                                                                                                                     $1,750,000

 

Because of the critical timeline for beginning the construction of the project this month, a few weeks before beginning of FY 2017, and because the project cost for the current configuration is higher than the amounts budgeted in the CIP, staff is requesting an amendment appropriating funds in the amount of $1,422,248 from the Sewer Replacement Fund (611) to fully fund the project in FY 2016.  This additional appropriation includes $1.1 million that was budgeted for expenditure in FY 2017, but which will now be used in FY 2016. The current project cost is $322,248 higher than the preliminary estimates included in the CIP. The preliminary estimates were based on the best available information at the time. During the inspection and design process, more issues came to light which pushed the total project cost higher.

 

SUSTAINABILITY FEATURES

 

Water:  Efficiency and conservation.

 

Maintain ability to efficiently and adequately treat wastewater before discharging into San Francisco Bay.

 

PUBLIC CONTACT

 

All work will be within the WPCF plant boundary; therefore no public contact is necessary for this project.

 

SCHEDULE

 

The following schedule has been developed for this project:

 

Approval of Plans and Specifications and Call for Bids

May 3, 2016

Award of Construction Contract

June 14, 2016

Construction Completion

December 2016

 

Prepared by: Suzan England, Senior Utilities Engineer

 

Staff contact

Recommended byAlex Ameri, Director of Utilities & Environmental Services

end

 

Approved by:

 

 

 

Fran David, City Manager

 

Attachments:

 

                     Attachment I                     Resolution

                     Attachment II                     Resolution Appropriating Funds

                     Attachment III Bid Summary