File #: PH 21-032   
Section: Public Hearing Status: Agenda Ready
Meeting Body: Planning Commission
Agenda Date: 4/8/2021 Final action: 4/8/2021
Subject: Proposed Establishment of a Drive Thru Coffee Shop and Convenience Store at 28590 Mission Boulevard (APN: 078C-0626-003-25), Requiring Approval of a Conditional Use Permit, Site Plan Review and Variance for Building Maximum Front and Side Street Setback where 12'-0" Maximum Is Required and where 107'-6" and 18'-6" Are Proposed, Respectively. Application No. 201800093; Tony Singh (Applicant), Bhubinder Singh (Owner).
Attachments: 1. Attachment I Staff Report, 2. Attachment II Findings for Approval, 3. Attachment III Conditions of Approval, 4. Attachment IV Project Plans

DATE:      April 8, 2021

 

TO:           Planning Commission

 

FROM:     Carl Emura, Associate Planner

 

SUBJECT                     

Title                      

 

Proposed Establishment of a Drive Thru Coffee Shop and Convenience Store at 28590 Mission Boulevard (APN: 078C-0626-003-25), Requiring Approval of a Conditional Use Permit, Site Plan Review and Variance for Building Maximum Front and Side Street Setback where 12’-0” Maximum Is Required and where 107’-6” and 18’-6” Are Proposed, Respectively. Application No. 201800093; Tony Singh (Applicant), Bhubinder Singh (Owner).                                                               

 

End
RECOMMENDATION

Recommendation

 

That the Planning Commission approve the Conditional Use Permit, Site Plan Review and Variance Application No. 201800093, based on the analysis set forth in this report and the attached Findings (Attachment II) and subject to the Conditions of Approval (Attachment III).

End

 

SUMMARY

 

The applicant proposes to demolish an existing 1,618-square-foot Gas Station/Auto Repair Shop and construct a new 2,763-square-foot Convenience Store and 1,210-square-foot Drive Thru Coffee Shop.  Though development standards require that the buildings be located a maximum of 12’-0” from the front and side street property lines, the existing location of the gas pumps, underground storage tanks and City easement make it infeasible to locate the building along the frontage and the applicant requests a variance on the maximum setbacks.  In addition, the applicant requests to continue operating the gas station from a Temporary Sales Kiosk during construction.

 

ATTACHMENTS

Attachment I                                          Staff Report

Attachment II                                          Findings for Approval

Attachment III                     Conditions of Approval

Attachment IV                      Project Plans