DATE: May 19, 2026
TO: Mayor and City Council
FROM: Director of Public Works
SUBJECT
Title
Adopt a Resolution Approving the Plans and Specifications and Calling for Bids for the FY24 Sewer Line Replacement Project, Project No. 07789
End
RECOMMENDATION
Recommendation
That City Council adopts a resolution (Attachment II) approving the plans and specifications for the FY24 Sewer Line Replacement Project, Project No. 07789, and calling for construction bids to be received on June 30, 2026.
End
SUMMARY
The Utilities Division of the Department of Public Works & Utilities manages replacement of the City’s undersized or structurally damaged sewer mains through annual Capital Improvement Program (CIP) projects. The FY24 Sewer Line Replacement Project will improve the capacity and maintain the operability of the sewer collection system by replacing or rehabilitating approximately 4.68 miles of existing vitrified clay pipe (VCP) and asbestos cement pipe (ACP) ranging in diameter from 6 to 10-inch with new 8, 10, 12, 15, or 18-inch PVC or HDPE pipe. This project takes place at twenty-six locations throughout the City (Attachment III). Approximately 2.04 miles will be replaced by traditional open-cut method, another approximately 0.77 mile will be replaced by trenchless technology used to cross under obstructions that prohibit open-cut installation, and approximately 1.87 miles will be repaired with Cured-In-Place Pipe (CIPP) lining. Design has been completed and bid documents have been prepared. Staff is requesting City Council’s approval of the plans and specifications and calling for bids to be received on June 30, 2026.
ATTACHMENTS
Attachment I Staff Report
Attachment II Resolution
Attachment III Location Map