DATE: April 19, 2022
TO: Mayor and City Council
FROM: Director of Public Works
SUBJECT
Title
Adopt a Resolution Approving Plans and Specifications and Calling for Bids for a Trash Capture Device Installation on Cotter Way, Project No. 07675
End
RECOMMENDATION
Recommendation
That Council adopts the attached resolution (Attachment II) approving the plans and specifications for Project 07675, the installation of one Continuous Deflective Separator (CDS) trash capture device in the existing storm drain on Cotter Way, and calling for bids to be received on May 17, 2022.
End
SUMMARY
The proposed project would install a CDS unit in the existing storm drain under Cotter Way for trash capture from the storm water system as part of the City’s trash reduction mandate from the San Francisco Regional Water Quality Control Board (Water Board). The CDS unit creates a continuous swirl of stormwater to concentrate and separate trash and debris. This project will be funded by the Environmental Protection Agency (EPA) Water Quality Improvement Fund grant awarded to the City in January 2015.
ATTACHMENTS
Attachment I Staff Report
Attachment II Resolution