File #: CONS 22-478   
Section: Consent Status: Passed
Meeting Body: City Council
Agenda Date: 9/6/2022 Final action: 9/6/2022
Subject: Adopt a Resolution Approving Plans and Specifications and Call for Bids for the Traffic Signal Modification at Huntwood/Industrial and Huntwood/Sandoval Intersections Project, Project No. 05737
Attachments: 1. Attachment I Staff Report, 2. Attachment II Resolution, 3. Attachment III Project Location Map

DATE:      September 6, 2022

 

TO:           Mayor and City Council

 

FROM:     Director of Public Works                     

 

SUBJECT                     

Title                      

 

Adopt a Resolution Approving Plans and Specifications and Call for Bids for the Traffic Signal Modification at Huntwood/Industrial and Huntwood/Sandoval Intersections Project, Project No. 05737                                                             

 

End
RECOMMENDATION

Recommendation

 

That the Council adopts a resolution (Attachment II) approving the plans and specifications, and calling for bids to be received on September 27, 2022 for the Traffic Signal Modification at Huntwood/Industrial and Huntwood/Sandoval Intersections Project, Project No. 05737.

End

 

SUMMARY

 

This project proposes recommended improvements, particularly enhancing bicycle and pedestrian safety, at these two intersections as follows:

 

1.                     Install protected left-turn phase at Huntwood Ave/Industrial Pkwy Way

2.                     Install protected-permissive left-turn phase at Huntwood Ave/Sandoval Way

3.                     Install Hybrid Video Detection for bikes and queue cutters

4.                     Upgrade Peer-to-Peer Communications

 

This report requests approval of the plans and specifications and call for bids for the project.  Staff was successful in obtaining a Highway Safety Improvement Program (HSIP) grant to fund 90% of the construction cost for the Project. The total Project cost is $965,000, which includes $861,000 for construction.  The City’s required local match of 10% is $86,100, which combined with the HSIP grant will provide the total construction cost of $861,000.  The remaining amount of $104,000 in the total project cost is for engineering design services and staff costs, and the total project budget has been previously appropriated through the FY 2022 budget process.

 