DATE: September 6, 2022
TO: Mayor and City Council
FROM: Director of Public Works
SUBJECT
Title
Adopt a Resolution Approving Plans and Specifications and Call for Bids for the Traffic Signal Modification at Huntwood/Industrial and Huntwood/Sandoval Intersections Project, Project No. 05737
End
RECOMMENDATION
Recommendation
That the Council adopts a resolution (Attachment II) approving the plans and specifications, and calling for bids to be received on September 27, 2022 for the Traffic Signal Modification at Huntwood/Industrial and Huntwood/Sandoval Intersections Project, Project No. 05737.
End
SUMMARY
This project proposes recommended improvements, particularly enhancing bicycle and pedestrian safety, at these two intersections as follows:
1. Install protected left-turn phase at Huntwood Ave/Industrial Pkwy Way
2. Install protected-permissive left-turn phase at Huntwood Ave/Sandoval Way
3. Install Hybrid Video Detection for bikes and queue cutters
4. Upgrade Peer-to-Peer Communications
This report requests approval of the plans and specifications and call for bids for the project. Staff was successful in obtaining a Highway Safety Improvement Program (HSIP) grant to fund 90% of the construction cost for the Project. The total Project cost is $965,000, which includes $861,000 for construction. The City’s required local match of 10% is $86,100, which combined with the HSIP grant will provide the total construction cost of $861,000. The remaining amount of $104,000 in the total project cost is for engineering design services and staff costs, and the total project budget has been previously appropriated through the FY 2022 budget process.
ATTACHMENTS
Attachment I Staff Report
Attachment II Resolution
Attachment III Location Map